A fuel oil tank (22m diameter x 15m high) on BAE’s Barrow site required internal refurbishment.
The work included:
• Scaffolding
• Pressure washing
• Grit blasting
• Application of an internal one-piece GRP lining system
• Risk Assessment and Method Statements
The work was completed to MoD specifications and carries a 10-year guarantee
|